ITI Logistics (Cambodia) Ltd. Phnom Penh - Cambodia

CALL OR CHAT NOW

023 217 **XX

WhatsApp AI Assistant Email

Ashhbritt101 Bathtub 22l Install -

: Always leak-test the slip joint drain assembly before closing up the walls or subfloor. Unlevel Rails

: Direct the loose end of the flexible drain hose toward your bathroom's floor drain or a shower stall to prevent potential flooding.

: Made from durable, high-quality plastic, this tub is easy to move and store when not in use. ashhbritt101 bathtub 22l install

Never finish the drywall or close up the access panel until you have thoroughly tested the system for leaks. The Leak Test : Plug the bathtub drain completely. Fill the tub : Fill the tub to its maximum 22L capacity.

Do not use silicone under the drain flange; putty provides superior long-term compression. : Always leak-test the slip joint drain assembly

. This prevents the floor of the tub from flexing or cracking over time and provides a solid, professional feel. Framing and Support

Let me know, and I can provide specific steps for your setup! Share public link Never finish the drywall or close up the

Carefully remove the bathtub from its packaging. Lay it out on a soft surface, such as a blanket or cardboard, to prevent any accidental scratches to the tub's material.

: Locate the drain hole at the bottom of the tub. Secure the drain plug or assembly according to the manufacturer's instructions, ensuring the rubber gaskets are correctly seated to prevent leaks.